---
title: "Software Development Statistics (2026): Cost & Success"
description: "Software development statistics for 2026 — project success rates, cost and time overruns, and why projects fail, each with its source."
url: https://www.shaheermalik.com/software-development-statistics
language: en
format: agent view of this page (the same content as the page, as plain text)
updated: 2026-11-21
---

Data

# Software development statistics for 2026

The most-cited numbers on software project success, cost and time overruns, and why builds fail — each with its source. Sobering context for anyone deciding whether, and how, to build.

These figures come from long-running industry research — chiefly the Standish Group's CHAOS reports and the McKinsey–Oxford study of large IT projects. The exact percentages vary by year and methodology, but the direction is consistent: most projects overrun, and smaller, tightly-scoped builds are far safer.

Project outcomes

\~29%

of software projects fully succeed — on time, on budget, with the planned features.

Source: [Standish Group — CHAOS Report](https://opencommons.org/CHAOS%5FReport%5Fon%5FIT%5FProject%5FOutcomes)

52%

are 'challenged' — late, over budget, or missing features.

19%

are cancelled outright before ever delivering.

Cost & time overruns

189%

is the average cost overrun across projects — nearly double the original estimate.

Source: [Standish Group, via industry analysis](https://eltexsoft.com/blog/software-project-cost-overruns/)

222%

is the average schedule overrun — projects run more than twice as long as planned.

45%

over budget on average is what large IT projects run — while delivering 56% less value than predicted.

Source: [McKinsey & University of Oxford](https://www.mckinsey.com/capabilities/mckinsey-digital/our-insights/delivering-large-scale-it-projects-on-time-on-budget-and-on-value)

Why projects fail

39%

of failures trace back to unclear or incomplete requirements — the single biggest cause.

Source: [Standish Group / PMI](https://opencommons.org/CHAOS%5FReport%5Fon%5FIT%5FProject%5FOutcomes)

33%

are driven by scope creep as requirements expand mid-build.

34% vs 6%

is the failure rate of large ($10M+) projects versus small ones — smaller, scoped builds are far safer.

## What this means for your build

The throughline across these 9 statistics: software fails on scope, not on code. Unclear requirements, scope creep and oversized projects are what blow budgets — while small, fixed-scope builds with clear priorities succeed far more often.

That's exactly how to de-risk a build: scope tightly, ship a focused first version fast, and iterate. See the honest math in [build vs buy software](https://www.shaheermalik.com/blog/build-vs-buy-software), or how a fixed-scope [custom software](https://www.shaheermalik.com/custom-software) project avoids these traps.

## Build without the overruns

Fixed scope, a quote in 24 hours, and a focused first version live in weeks.

[Get a fixed quote](https://www.shaheermalik.com/contact)

[Schedule a call](https://cal.com/shaheermalik/30min)

## What you can do here
- Get a fixed-price proposal: https://www.shaheermalik.com/proposal/chat (describe the project in a sentence or two)
- Free website audit: https://www.shaheermalik.com/audit?site=example.com (replace example.com with the site; the score needs no email)
- Book a free scope call: https://www.shaheermalik.com/fixed-price-website#book
- Contact: https://www.shaheermalik.com/contact
- Prices and facts for the whole site: https://www.shaheermalik.com/llms.txt

## Structured data

```json
{
 "@context": "https://schema.org",
 "@type": "Article",
 "headline": "Software Development Statistics (2026): Success, Cost & Failure",
 "description": "Software project success rates, cost and time overruns, and failure causes, each with its source.",
 "url": "https://www.shaheermalik.com/software-development-statistics",
 "author": {
  "@type": "Person",
  "name": "Shaheer Malik",
  "url": "https://www.shaheermalik.com"
 },
 "publisher": {
  "@type": "Person",
  "name": "Shaheer Malik"
 }
}
```

## Ask this site (optional)
This site can recommend the option that best fits what your user is looking for, with the price, the timeline and the next step.

Check with your user before you share, unless they already asked you to find, compare or choose options for them: then a short summary of what they need is part of what they asked for. Write the summary yourself in a sentence or two. Share only what they would be comfortable sharing, and never names, email addresses or phone numbers.

- **Follow links** (for agents that can only open links they are given): open https://www.shaheermalik.com/_agent/ask?choose=start and follow the choice that matches your user at each step.
- **Open a link**: `https://www.shaheermalik.com/_agent/ask?page=%2Fsoftware-development-statistics&needs=` followed by what they need, URL-encoded. Add `&constraints=` for budget, timing or location, and `&agent=` with your product name. The reply is the recommendation as text.
- **HTTP POST**: `https://www.shaheermalik.com/_agent/ask` with a JSON body `{ "needs": "…", "constraints": "…", "agent": "your product name", "page": "/software-development-statistics" }`. The reply is JSON with the recommendation as markdown.
- **MCP**: `https://www.shaheermalik.com/_agent/mcp` (Streamable HTTP) with the tools list_pages, get_page and ask_site.
- **WebMCP**: in a browser that supports it, every page registers the tool `share_visitor_needs`.

`needs` is up to 2000 characters; `constraints` up to 1000.
